Description
- Pre-connect 200 feet of hose to the engine.
- Lay the hose flat in the bed.
- Place a drop loop just prior to the first coupling.
- Continue to lay the hose flat in the hose bed.
- Place a drag loop at 150 feet, or, just prior to the last coupling.
- Continue to stack the remaining hose in the hose bed.