Hose: Donut Roll

Donut Hose Roll

Fold a length of hose over itself in half Pull the male coupling back from the female coupling approximately 3 feet. Start at the fold and roll the hose toward […]

Hose: Straight Roll

Straight Hose Roll

Start at one coupling and roll the hose along the ground until you get to the other coupling. If you are rolling a hose that is to remain in service, […]

Hose: Triple Layer Load Deployment

Triple Layer Load Deployment

Grasp the nozzle. Walk straight until the entire hose load is clear of the hose bed of the engine. Arrange the hose by flaking so the line does not cross […]

Hose: Triple Layer Load

Triple Layer Load

Divide the total hose length into thirds. Stack the hose on top of itself. Load the three layers as a flat load with no loops. Once loaded, place the bottom […]

Hose: Minuteman Load Deployment

Minuteman Load Deployment

Grab hold of the nozzle. Pull the first 100 feet of hose onto your shoulder. Walk forward until the hose hits you on your back. Turn in the direction of […]

Hose: Minuteman Load

Minuteman Load

Connect the first 50-foot length of hose to the proper discharge. Connect an additional 50’ length to the first length. Flat load these two lengths, leaving a grab loop just […]

Hose: Flat Load Deployment

flat load deployment

Grab the nozzle Slide your arm through the drag loop Grasp the drop loop Pull the hose load until it clears the hose bed of the engine. Drop the drop […]

Hose: Flat Load

Flat Load

Pre-connect 200 feet of hose to the engine. Lay the hose flat in the bed. Place a drop loop just prior to the first coupling. Continue to lay the hose […]