Hose: Donut Roll

Donut Hose Roll

[vc_row][vc_column][vc_column_text] Fold a length of hose over itself in half Pull the male coupling back from the female coupling approximately 3 feet. Start at the fold and roll the hose […]

Hose: Straight Roll

Straight Hose Roll

[vc_row][vc_column][vc_column_text] Start at one coupling and roll the hose along the ground until you get to the other coupling. If you are rolling a hose that is to remain in […]

Hose: Triple Layer Load Deployment

Triple Layer Load Deployment

[vc_row][vc_column][vc_column_text] Grasp the nozzle. Walk straight until the entire hose load is clear of the hose bed of the engine. Arrange the hose by flaking so the line does not […]

Hose: Triple Layer Load

Triple Layer Load

Divide the total hose length into thirds. Stack the hose on top of itself. Load the three layers as a flat load with no loops. Once loaded, place the bottom […]

Hose: Minuteman Load

Minuteman Load

[vc_row][vc_column][vc_column_text] Connect the first 50-foot length of hose to the proper discharge. Connect an additional 50’ length to the first length. Flat load these two lengths, leaving a grab loop […]

Hose: Flat Load Deployment

flat load deployment

[vc_row][vc_column][vc_column_text] Grab the nozzle Slide your arm through the drag Grasp the drop loop Pull the hose load until it clears the hose bed of the engine. Drop the drop […]

Hose: Flat Load

Flat Load

[vc_row][vc_column][vc_column_text] Pre-connect 200 feet of hose to the engine. Lay the hose flat in the bed. Place a drop loop just prior to the first coupling. Continue to lay the […]